Ambient temperature of 25 ℃, 2-3 days after construction should reach hard work, that hardness of about 80% complete cure; 2, the surface does not appear sticky phenomenon; 3, the bubble: flat coated type, mortar type no bubbles, gravity Allow a small bubble level 10 square meters; 4, good leveling, no trowel marks, a large area of ??the interface is substantially flat; 5, no blurs, uniform color, large-area interface allows for very obvious The color; 6, no coarse impurities, but allows air in tiny defects caused by dust falling 7, smooth floor surface should be smooth, gloss should meet the design requirements (high gloss ≥90, bright ≥70, half-light 50 to 70), flat coated type of light, water for semi-gloss - matt; 8 non-slip surface mortar orange peel effect should be very obvious. Edit this paragraph with matters: Oxygen floor before construction must comply with the matter: confirm the construction area and construction specifications (color and construction area); b prime land before construction of the need to maintain a clean environment; c Construction of the power to determine the required connection... point and the length of the power cord;. d with other purification, construction and other works on the coordination of job progress; e lighting and lighting equipment;.. f material and equipment storage area. Epoxy construction must comply with the matter: the construction workers and the construction area access control; b construction waste storage area; c must comply with the matter after the construction site supervision staff and coordinators> Floor construction:... A . conservation area personnel access control;. b clean up the job site and tune borrowed items restitution;. c actual construction area measurement and acceptance. Epoxy discoloration prevention:, epoxy floor before construction should stir evenly. Several different complex paint pigment density in storage of heavy pigment gradually sinking, light pigment gradually go up, if not, stir when in use, and the colors will not match after construction. 2, metallic paint and varnish should be dispensed. Metal powder pigments in storage by paint remnants of the free acid corrosion, black hair will turn green. 3, high acid coating should not use metal pail. High acid value of varnish prone to chemical reaction with iron drums bold varnish reduce transparency, color darker. 4, need to select a resin coating formulation and a pigment. Individual paint pigments to light and heat is not good, some bad weather resistant resin, encountered light and easy to turn yellow. 5, coating formulation design should be careful not to use chemical reactions can occur with pigment resin or additives. In the construction of the toner is prohibited without the test, it arbitrarily two different types of paint mixed with the toner used. Part compound pigment chemical changes occur, the loss inherent in the coloring pigment, cause fading or discoloration. Containing iron such as blue or blue-green paint, during storage will fade, but the construction is exposed to air, the pigment will gradually recover. Hotline: 023-8619-2916 Floor Paint Engineering: 18580203619 Mr. Chen Wei Online QQ: 243013792 Product Sales: 18716261167 Yu Online QQ: 1138807613 Company: Chongqing Seoul Plaza Building Decoration Engineering Co., Ltd. Address: Dadukou District, Chongqing Jinxia TIANCHEN Washington Street